Tagged : Leading Edge Real Estate

There are currently 3 blog entries matching this tag.

Canterbury Farms consists of several phases, based on lot size and builder

Builders include: Faircloth, Winchester Builders and Ivey Residential who has lots in Brantley Cove, Lancaster and Ellingon at Canterbury Farms.

Winchester lots:

Bridgewater has lots under 60’ wide with homes priced in the low $200,000 range up to 2300 square foot. This phase is almost sold out.

 

Newbridge lots are about 65’ wide with homes in the mid $200,000 price range for homes up to about 2900 square foot. This phase only has a few more lots as of December 2014.

Camden, 1892 Heated Square Foot, 4 bedrooms, 2 1/2 baths

Callaway, 2535 Heated Square Foot, 4 bedrooms, 2 1/2 baths

Canyon, 2483 Heated Square Foot, 4 bedrooms, 2 1/2 baths

Charleston, 2830

1,126 Views, 0 Comments.

Southwind village, one of Columbia County's newest neighborhood developments, is underway off of Hereford farm road, in Evans, Georgia. The neighborhood will have about 96 lots.

One of the builders in Southwind Village will be Wilson Parker Homes. They will have homes in the low $200,000 range up to mid $350,000. Square footage ranges from around 2,200 all the way up to 6,000 plus square feet.

There are a multitude of different floorplans you can choose from! Most floorplans have different “elevations” or packages that you can choose from. The standard package is level C, but you can upgrade finishes to your choosing based on each specific package. Below are the Wilson Parker floor plan options.

  • Hudson- Bonus: 2,250 Heated Square Foot, 4

4,496 Views, 0 Comments.

Plant Vogtle is located just outside Waynesboro, Georgia in Burke County and is also a short drive to Hephzibah, Georgia in Richmond County. It is one of Georgia Powers two nuclear facilities in the Southern Company system that currently has two nuclear reactors in operation. These two nuclear reactor units began operation in the late 1980s and supply power to Southeast states.

Just last week (Nov. 21, 2013) concrete was poured for the new nuclear reactor unit number four also under construction along with unit three. When completed plant Vogtle will be the only US built nuclear reactor constructed in the last 30 years and be the only four unit nuclear facility in the entire United States.  The cost of units three and four is expected to exceed $4

1,505 Views, 0 Comments.